Change Orders in Construction: Why They Happen and How to Avoid Costly Surprises
- snsadmin9
- Jan 22
- 2 min read
Few things cause more frustration during a construction project than an unexpected change order. Homeowners often hear the term after construction has started, usually when cost or scope changes are already in motion. The reality is that change orders are common — but when managed correctly, they don’t have to derail a project.
At Structure & Style Design Build, we believe transparency around change orders starts before construction begins.
What Is a Change Order?
A change order is a formal modification to the original construction contract. It typically adjusts:
Scope of work
Materials or finishes
Design details
Project cost
Timeline
Change orders are not inherently bad. They become a problem when they are frequent, unplanned, or poorly documented.
The Most Common Reasons Change Orders Occur
Most change orders fall into one of three categories:
1. Design decisions made too lateWhen selections like cabinetry, fixtures, layouts, or finishes aren’t finalized before construction, adjustments often occur mid-build — increasing labor and material costs.
2. Hidden conditionsOnce walls, floors, or ceilings are opened, issues such as outdated wiring, plumbing problems, or structural deficiencies may be discovered. These conditions can’t always be identified during initial walkthroughs.
3. Scope creepHomeowners sometimes add work once they see progress happening — additional outlets, upgraded materials, or expanded areas. While understandable, these changes should be managed carefully.
Why Change Orders Cost More During Construction
Changes made after work has started typically cost more because they disrupt sequencing. Trades may need to return, materials may need to be reordered, and completed work may require removal or rework.
This is why early planning and clear documentation matter so much. The more decisions that are finalized upfront, the fewer surprises appear later.
How a Design-Build Approach Reduces Change Orders
Design-build allows planning, design, and construction to work together from the beginning. This helps:
Identify constructability issues early
Align budgets with real-world costs
Finalize selections before work starts
Reduce guesswork during construction
When expectations are clear from the start, change orders become intentional decisions — not emergencies.
Managing Change Orders the Right Way
When change orders are necessary, they should always be:
Clearly documented
Approved in writing
Priced transparently
Tracked separately from the original contract
This protects both the homeowner and the contractor and keeps the project organized.
Building With Fewer Surprises
Change orders don’t define a bad project — poor planning does. With the right preparation, communication, and structure, changes can be managed without stress or confusion.
At Structure & Style Design Build, our goal is simple: fewer surprises, clearer expectations, and projects that stay aligned from start to finish.